No ads found for this position

Bridge constructed at Jhedi in Gulmi’s Musikot Municipality

According to him, this design of bridge is constructed at locations where it is difficult to build concrete bridges.

No ads found for this position

GULMI: The construction of the bridge connecting Badagaun, Ward No 3 and Bami, Ward No. 7 of Musikot Municipality in the district has been completed.

The 56.30 metres long bridge over the local Jhedi rivulet was constructed at a cost of Rs 51 million 750 thousand 665 received from the Swiss government, said engineer at the Local Roads Bridge Programme, Shreeram Prajapati.

According to him, this design of bridge is constructed at locations where it is difficult to build concrete bridges.

This bridge was rebuilt with a new design after it broke in 2076 BS and in 2077 BS. The state suffered damage when the bridge broke.