No ads found for this position
Blocked Muglin-Naubise road operation after 11 hours
No ads found for this position
MUGLIN: SEPT. 22 – The Muglin-Naubise road, which was blocked due to landslides, has come into operation. The road, which had been blocked on both sides since 11 pm last night due to a landslide near Ichhakamana-4 Nagdikhola in Chitwan, came into operation after 11 hours.
According to the Area Police Office, Muglin, two loaders of the Road Division Office have been operating the road since 10 am. As soon as the landslide subsided, vehicles started moving towards their destination.
Related News