No ads found for this position
One-way traffic resumes in BP Highway
No ads found for this position
July 4, 2021
KATHMANDU: JULY 4 – The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi Rural Municipality was cleared. One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project, and locals.
The road section in the border of ward numbers 11 and 12 of the rural municipality remained closed since 12:00 midnight on Friday and resumed at 2:30 pm on Saturday, police inspector at Area Police Office, Mangaltar Sherkhar Khadka said.
An excavator was used to clear the sludge gathered on the road and hence one-way traffic was resumed. A large number of vehicles and their passengers had remained stranded as a result.
July 4, 2021
Related News